||| FROM DOUGLAS VANDERGRAPH |||
San Juan County has rescheduled replacement of the Orcas Landing public-dock float for December 3 and 4. According to its November 23 announcement, there will be no marine access at that facility during the work. The county had postponed the original November 18–19 installation while the ferry terminal needed emergency repairs, keeping the public dock available as a possible passenger-only connection.
That was a sensible recognition of what the dock means to an island. It also points to a question worth answering before the next disruption: if a resident must use that backup connection, how will the resident know whether it is operating, how to reach it, and whether it can accommodate them?
Orcas Island residents have just seen how quickly transportation arrangements can change. Normal vehicle loading resumed on November 15 after the terminal disruption, according to San Juan County. The county has since set new construction dates, shortly after a Thanksgiving travel period for which Washington State Ferries expects nearly 300,000 travelers systemwide. No one needs to predict another ferry problem to recognize the value of clear, reliable instructions when a transportation option becomes unavailable.
A dock can be available in a technical sense while remaining inaccessible in practice to someone who cannot drive, cannot use steps easily, or depends on a ride arranged hours in advance. A parent traveling with a child, an older neighbor with limited balance, and a worker who cannot afford to miss a shift may need different assistance. I am not claiming to know their individual circumstances. I am asking that the public instructions anticipate ordinary human differences.
San Juan County Public Works and Washington State Ferries could jointly maintain a short, date-stamped explanation for Orcas Landing that answers four questions.
- Is the public dock open today?
- Under what circumstances could passenger-only service use it?
- Who announces that service and gives its operating times?
- What accessible boarding and ground-transport options are actually confirmed, and whom should a rider contact if they cannot use the advertised route?
The distinctions matter. A construction update does not necessarily answer a ferry rider’s question.
A ferry alert about vehicle loading does not necessarily explain a public dock’s status. A general instruction to check online may not help the resident whose electricity, internet connection, or confidence with a phone is limited. At minimum, the same verified update should be easy to find through county and ferry channels, with a telephone contact and a clearly marked last-update time.
Churches, the library, community groups, and the senior center could share that official information without becoming responsible for inventing transportation arrangements.
There is a further test. Before a backup connection is needed, officials could walk through a realistic trip with someone who uses a mobility aid or cannot travel alone. Start with the public notice. Can that person understand where to go and what to expect? Can they reach the landing? Is boarding possible for them on the specific vessel that might be used? If an answer is unknown, saying so plainly is far more useful than a reassuring phrase that turns out to be wrong at the dock.
This is one of the places where my Christian faith speaks most directly to a practical public question. In Mark 2, several friends carry a paralyzed man to Jesus. The crowd blocks the ordinary entrance, so they find another way to bring him inside. The story does not invite us to romanticize obstacles or tell people with disabilities to be more determined. It shows friends taking a barrier seriously enough to change their own plans. Their care becomes visible in what they do.
Government agencies have different responsibilities from friends, and neither can promise a perfect crossing in every emergency. Yet the same moral question applies to the rest of us: have we described the available route from the standpoint of the person most likely to be stranded by it?
That is a sharper question than whether the announcement was posted on time.
The county deserves credit for delaying work when keeping the float open mattered. Before the December 3–4 closure, however, residents deserve a single plain-language notice explaining the temporary loss of marine access, where to check for changes, and what verified alternatives exist.
The replacement project should leave behind something more durable than new equipment: a shared, tested way of explaining who can get across, how, and with what help when plans change. An island’s backup route should be judged first by the neighbor who needs it most. If that person can understand and use the plan, everyone else will be better served, too.
**If you are reading theOrcasonian for free, thank your fellow islanders. If you would like to support theOrcasonian CLICK HERE to set your modestly-priced, voluntary subscription. Otherwise, no worries; we’re happy to share with you.**
Leave A Comment