— from Shannon Wilbur for San Juan County Public Works —

Work Zone with Detour
When: Week of May 27
Where: Orcas Road north of McNallie Road
Why: Stump removal and grinding

This week, the stormwater detention ponds were installed on either side of Swan Road to provide water quality treatment. Guardrails between the road and ponds will be installed soon.

The Contractor will take a break from road building next week to go back and take care of finish items along the road, such as installing field access points, cleaning out ditches, and addressing all the miscellaneous details to clean up the site. Traffic control will be handled with flaggers.