  •  4-day work week is anticipated, with the site open Friday, Saturday, and Sunday for the Memorial Day holiday weekend.
  • Sewer Switch over, new sewer line and service connections south of A Street will be activated and existing line decommissioned.
  • Site demolition is planned, activities may include cutting, pulverizing and hammering for final removal of all existing curb, gutter and sidewalk and roadway pavement.
  • Contractor is installing new lateral catch basins, storm drains, and stormwater treatment structures. 
  • New Road Closure and Detour 24hr a day during the construction along the Entire Project see the temporary traffic closure map. 
  • North Beach Rd closure south of Enchanted Forest Rd and north of Victory Hill, Prune Alley intersection closed. 
  • School Road closure west of Pine Street to through traffic, Prune Alley intersection closed.
  • Rose Street closure west of Pine Street to through traffic, Prune Alley intersection closed.
  • A Street closed between Prune Alley and North Beach Road.
  • Prune Alley closed north of Main Street.
  • Pedestrian and vehicular access will be limited during pulverization and demolition activities
  • Contractor will work to restore access to the areas as soon as possible to limit full road closure